The dl380 g9 hp Diaries
The dl380 g9 hp Diaries
Blog Article
سلام وقتتون بخیر، ارسال به شهرستان هم دارید؟چه مدت زمان میبره تا ارسال شه؟
The one considerable difference between the DL360 Gen9 and the DL380 Gen9 is their dimension, which determines exactly how much Room has to be built for your server, and the quantity of drives it could be equipped with.
با عضویت در خبرنامه از آخرین پیشنهادها و تخفیف های ما زودتر از بقیه با خبر شوید! ثبت نام
Mirrored memory configuration Mirroring gives safety versus uncorrected memory mistakes that would if not cause server downtime.
assumes you're experienced while in the servicing of Laptop products and experienced in recognizing hazards in goods with hazardous Electrical power
Battery substitute In case the server not instantly displays the proper date and time, you might need to interchange the battery that gives electrical power to the real-time clock.
You may be pondering where one other two SFF drives go. HP has redesigned the PSUs by building them twenty per cent scaled-down and fitted them aspect by facet within the again And so the Room above can be employed for two further scorching-swap drives.
HP has tightened up its server guidance as You simply get access to standard ROM BIOS firmware updates with a valid guarantee or assistance deal. Nonetheless, it'll deliver open up entry to crucial firmware updates despite help agreements.
HP hasn't finished absent with FlexibleLOM It really is just moved the connector about to one other aspect. You could improve whenever you want and HP provides quad Gigabit and twin fibre or copper 10GbE mezzanine cards.
Both equally servers make full use of Intel's E5-2600 Xeon series of processors, and two could be set in Every server. This permits for up to eighteen processor cores, and which has a set of processors, This implies around 36 processing threads. With all the Xeon series' use of Intel's hyper-threading technological know-how, that is an enormous degree of processing electricity.
نشانی ایمیل شما منتشر نخواهد شد. بخشهای موردنیاز علامتگذاری شدهاند *
Energy up the server ("Powering up the server" on site 26). three-slot PCI riser cage possibility WARNING: To lower the chance of personalized injuries, electric shock, or harm to the products, clear away the ability cord to eliminate electric power from your server. Pressing the Power On/Standby button does not shut off system electrical power completely.
They may be a strong option for applications contacting for dynamic workloads, including higher performance databases and cloud-centered computing. And they could even be used for Major Facts applications, which refers to procedures that Get unbelievable quantities of knowledge. This Generally involves various simulation and analytical apps.
Warning: If your DC relationship exists concerning the earthed conductor with the DC offer circuit plus the earthing conductor with the server devices, the subsequent circumstances needs to be met: • This gear should be connected straight to the DC provide more info program earthing electrode conductor or to some bonding jumper from an earthing terminal bar or bus to which the DC source procedure earthing electrode conductor is linked. Web page 39: Setting up Hardware Choices
The 2GB FBWC can also be optional and its contents are protected by a new 96W superior effectiveness Li-Ion battery.